Published 2017-09-16
How to Cite
How to Cite
Abstract
Starting from the humankind’s basic need for shelter, via making continuous progress, construction industry is shaping quality of life and welfare of societies and has reached its today’s level. Turkish construction industry has also a key economic position with its contributions to Turkish economy and Turkish citizen’s welfare. The purpose of this study is to show how supply chain and logistics applied in construction industry to engage attention of researchers and contribute Turkish literature which have limited number of studies about this subject. In this regard secondary data such as scientific literature and industry reports examined and as well as primary data collected from four experts working as executives in construction industry. To summarize the findings of the research: according to experts in their firms planning of logistics and supply chain operations are not given enough attention, logistics techniques are not effectively applied and lack of communication coordination are faced among supply chain actors.
References
- Akboğa, Ö. ve Baradan, S. (2012). "İnşaat Sektöründe Malzeme Tedarik Yönetiminin Önemi". E-journal of New World Sciences Academy, 7(1): 350-357.
- Arıkan A.,(2009). “İnşaat Sektöründe Ortak Girişim Projelerinde Lojistik” Yayınlanmamış Yüksek Lisans Tezi. İstanbul:Yıldız Teknik Üniversitesi Fen Bilimleri Enstitüsü.
- Beamon, B. M., & Chen, V. C. (2001). “Performance Analysis of Conjoined Supply Chains”. International Journal of Production Research 39(14):3195-3218.
- Bemelmans, J., Voordijk, H., Vos, B. ve Buter, J. (2012), “Assessing Buyer-Supplier Relationship Management: Multiple Case-Study in the Dutch Construction Industry,” Journal Construction Engineering and Management 138 (1):163-176.
- Benton W. C. ve McHenry, L. (2010), “Construction Purchasing and Supply Chain Management” New York: McGraw-Hill.
- Bourn, J. (2001). Modernising Construction. UK: National Audit Office.
- Bozyiğit, S., ve Kılınç Doğan, G. (2015). “Türkiye'deki Doğal ve Organik Ürün Üreticilerinin Yaşadığı Pazarlama Sorunları: Keşifsel Bir Araştırma”. Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, 17(2):33-47.
- Eccles, R. G. (1981) “Bureaucratic versus Craft Administration: The Relationship of Market Structure to the Construction Firm”. Administrative Science Quarterly, 26: 449- 469.
- Egan, J. (1998). Rethinking Construction. Department of the Environment, Transport and the Regions, London.
- Egan, J. (2002). Accelerating Change: A Report By The Strategic Forum For Construction. SF f. Construction, London.
- ENR (Engineering News Record) (2016). “Top 250 International Contractors”. (http://www.enr.com/toplists/2016-Top-250-International-Contractors 25 Aralık 2016 tarihinde erişildi).
- Formoso, C. T. ve Isatto, E. L. (2008). “Production Planning and Control and the Coordination of Project Supply Chains”. Construction Supply Chain Management- Handbook. Eds. O’Brien, W. J.,Formoso, C. T., Vrijhoef, R. ve London, K. A. Boca Raton: CRC Press. 181-193.
- Güner, S. ve Cebeci, H. İ. (2015). Konut Sektörü Analizi içinde “İnşaat Sektöründe Tedarik Zinciri Yönetimi ve Lojistik Uygulamaları” Sakarya Üniversitesi İşletme Fakültesi Yayınları
- Koçtaş, Ö., ve Tek, Ö. B. (2013). “Construction Supply Chains: A Proposal to Develop a New Conceptual Model”. International Logistics and Supply Chain Congress Kapadokya:LODER.
- Koskela, L. (1992). “Application of the New Production Philosophy to Construction” (Teknik Rapor No. 72). Stanford, CA: Stanford University.
- Latham, M. (1994). Constructing The Team: Review of Procurement and Contractual Arrangements in the UK Construction Industry. HMSO.
- Lundesjo, G. (2015). Supply Chain Management and Logistics in Construction Delivering Tomorrow's Built Environment. London, Philadelphia:Kogan Page.
- Maqsood, T., Finegan, A. D. ve Walker, D. H.T. (2003). “Extending Knowledge Management Across The Supply Chains In The Construction Industry: Knowledge Sharing In Construction Supply Chains”. Second International Conference on Construction in the 21st Century (CITC-II) “Sustainability and Innovation in Management and Technology” 10-12 December, 2003, Hong Kong.
- Matouzko, V. ve Methanivesana, N. (2012). Improving Construction Logistics: A Case Study of Residential Building Project. Yayımlanmamış Bitirme Projesi. Stockholm:KTH Rotal Institute of Technology.
- Meho, L. I. (2006). “E‐mail Interviewing in Qualitative Research: A Methodological Discussion”. Journal of the Association for Information Science and Technology, 57(10): 1284-1295.
- Meng, X.., Sun, M. ve Jones, M. (2011). “Maturity Model for Supply Chain Relationships in Construction”. Journal of Management in Engineering, 27(2): 97-105.
- Moavenzadeh, F. (1994). Global Construction and the Environment: Strategies and Opportunities. New York:John Wiley & Sons.
- Morledge, R., Knight, A. ve Grada, M. (2009). “The Concept and Development of Supply Chain Management in the UK Construction Industry” Construction Supply Chain Management : Concepts and Case Studies. Ed. S. Pryke. Chichester: Wiley-Blackwell. 23-41.
- Mossman, Alan (2007). “Construction Logistics”. (http://www.thechangebusiness.co.uk/TCB/downloads_files/_Construction_Logistics-together_at_the_workface_0711.pdf , 25 Şubat 2017’de erişildi).
- Naoum, S. (2003). “An Overview Into the Concept of Partnering”, International Journal of Project Management, 21: 71–76.
- O'Brien, W., J., Formoso, C., T., Ruben, V. ve London, K. (Eds.). (2008).Construction Supply Chain Management Handbook. Boca Raton:CRC Press.
- Özçelebi, O. (2011). “Determinants of Construction Sector Activity in Turkey: A Vector Autoregression Approach”, Intemational Joumal of Economics and Finance, 3(5): 130-139.
- Rogers, P. (2005). Improving Construction Logistics. Strategic Forum for Construction Logistics Group Raporu. Büyük Britanya.
- Polat, G. ve Ballard, G. (2003). “Construction Supply Chains: Turkish Supply Chain Configurations for Cut & Bent Rebar”. 11th International Group of Lean Construction Congress , Virginia Polytechnic Institute and State University, Blacksburg, VA, 319-331.
- Pryke S. Ed. (2009) “Construction Supply Chain Management:Concepts and Case Studies”. Chichester:Wiley-Blackwell.1-19.
- Robbins, S. ve Thomas, A. (2013). “Construction Logistics: Delivering an Effective Strategy”. Logistics & Transport Focus, 15(3):68-71.
- Sadeghpour, F,. Moselhi, O. ve Alkass, S. T. (2006). Computer-Aided Site Layout Planning. Journal of Construction Engineering and Management, 132(2):143-151.
- Salamı, E., Laptalı Oral, E. ve Aydınlı, S. (2015). “Yüklenici Firmaların Tedarik Zinciri Yönetimi Uygulamalarında Kritik Başarı Faktörleri”. Çukurova Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi, 30(1):17-23.
- Sullivan, G., Barthorpe, S. ve Robbins, S. (2011). Managing Construction Logistics. Chichester:Wiley-Blackwell.
- Takim, R. ve Akintoye, A. (2002). “Performance Indicators for Successful Construction Project Performance”. 18th Annual ARCOM Conference (2), 545-555.
- TDK (Türk Dil Kurumu) Güncel Türkçe Sözlük (2016a). http://www.tdk.org.tr/index.php?option=com_bts&arama=kelime&guid=TDK.GTS.599299a2d61ac0.09147466 , 10 Ocak 2016’da erişildi).
- TMB (2016). “Turkish Contracting in the International Market”. http://www.tmb.org.tr/doc/file/YDMH_April_2016.pdf 10 Mayıs 2016’da erişildi).
- Tuzkaya, U. (2015). “Yapı Malzemeleri Sektörü ve Lojistik İlişkisi”, (https://www.timfed.com.tr/koseyazisi/doc-dr-umut-r-tuzkaya/yapı-malzemelerı-sektoru-ve-kentsel-lojıstık-ılıskısı/28/, 17 Nisan 2017’de erişildi).
- Vidalakis, C., Tookey, J. E., ve Sommerville, J. (2011). “The Logistics of Construction Supply Chains: The Builders' Merchant Perspective”. Engineering, Construction and Architectural Management, 18(1): 66-81.
- Voigtmann, J. ve Bargstädt, H-J. (2010). “Construction Logistics Planning by Simulation”. In Simulation Conference (WSC), Proceedings of the 2010 Winter IEEE: Baltimore, MD, USA.
- Vrijhoef, R. ve Koskela, L. (2005). “Revisiting the Three Peculiarities of Production in Construction”. International Group for Lean Construction Conference. Sydney, Australia: International Group for Lean Construction.
- Vrijhoef, R. ve Koskela, L. (2000). “The Four Roles of Supply Chain Management in Construction”. European Journal of Purchasing & Supply Management, 6(3): 169-178.
- Wahab, M. R. A. ve Ahmad, H. (2014). “The Performance Measurement of Supply Chain Management (SCM) in Malaysian Infrastructure Project”. Applied Mechanics & Materials, 567:642-647
- Young, D. A., Haas, C. T., Goodrum, P. ve Caldas, C. (2011). “Improving Construction Supply Network Visibility by Using Automated Materials Locating and Tracking Technology”. Journal of Construction Engineering and Management, 137(11):976-984.
- Zolfagharian, S. ve Irizarry, J. (2014). “Current Trends in Construction Site Layout Planning”. Construction Research Congress: Construction in a Global Network. Atlanta-USA: Georgia Institute of Technology ve American Society of Civil Engineers.1723-1732.